Development of the design for the grid reconstructing the Kurzeme Ring 330 kV and 110 kV power transmission network connection and preparation of the related environmental impact assessment

Projekta galvenā bilde

Client: Latvenergo AS

Project completion period: 2010–2011

Project description: reconstruction of the existing 110 kV power transmission lines, replacing the previous two-circuit 110 kV power transmission lines with power transmission lines, in which lines of different voltages: 330 kV and 110 kV respectively, were positioned on the same towers. Total length of the rebuilt power transmission lines: 126 km, crossing about 480 individual properties.